American TerawattTransmission Planner
Loading map…
GIS / Right of Way
Map data layers
Editing
Generating a set of optimized candidate routes
Private transmission laws
Favorable
Constrained
Unfavorable
Not classified
Click a state for detail. AI first-pass — verify with counsel.
generation data-center load
⊕ Click the map to set this point's coordinatesEsc to cancel
Loading…
Length
Parcels crossed ▸
Unique landowners ▸
RoW counterparties ▸
Route impact dashboard
MetricCurrentChange

Untitled Design

Click IPP/load dots to add terminals, load a preset, or use “Select points on map” to drop free points.
② Load
③ Route
1
Pick a power gen source
A power gen source — the green icons on the map.
2
Pick a load
A data center — the black dots to connect to.
3
Draw the route
Trace a transmission corridor between them.
Click a power gen source on the map.
Or click anywhere on the map to start the route from that exact spot.
Now click a load on the map to connect to.
Or click anywhere on the map to end the route at that exact spot.
Click any two points on the map to connect them, or add custom points. Click the last point again to chain onward.
Points
Bookmarks
Custom Points
Routes
Applied when you generate candidate routes: which rights-of-way a corridor may follow, what it must not cross, and which protected land to avoid.
American TerawattTransmission Planner
Point to Point Routes
Multi-Terminal Routes
Point to Point
Multi-Terminal
Explore Power Generation
Explore Interconnection Queue
Create routes
saved corridor designs — click one to open it for editing
Loading your designs…
American TerawattTransmission Visualizer
3D terrain
Loading 3D terrain & elevation…
My saved designs
Loading…
Share design
People with access
General access
🌐
Save design
Add a load site manually MANUAL ENTRY
For intel that is NOT from a public filing — developer decks, broker tips, emails, SemiAnalysis leads, pipeline deals. It is stored separately from the filings dataset and always displayed with a manual-entry flag.
This point lives in this session only — nothing is saved to the dataset.
* required — every other field is optional
Upload edges
Build a whole design at once from an edge list — one connection per line. Paste the list below, or load it from a TXT file.
Each side of a connection
lat,lng | name | gen/load | type | MW
lat,lng is required — it places the point. name, gen/load, type, MW are optional, in any order. Reuse the same lat,lng on another line to make a hub.
Example
38.42,-112.83 | Cape Station | gen | geothermal -> 32.45,-99.73 | Joule Delta | load 38.39,-113.01 | Milford Solar | solar | 400MW -> 32.45,-99.73 | Joule Delta 38.35,-112.90 -> 32.20,-110.97
Download an example file ›
Import route
From a file — ArcGIS shapefile (.zip), KML/KMZ, or GeoJSON — or straight from a Felt map's drawn routes.
— or —
Share this design
Anyone at American Terawatt can open this link after signing in.
American Terawatt

You need access

Request access, or switch to an account with access.

You’re signed in as
Coordinate verification